- Home
- Products
-
-
Solids Control Equipment
- Linear Motion Shale Shaker
- DC Series Decanter Centrifuge
- Mud Cleaner
- Vacuum Degasser
- Centrifugal Pump
- Shear Pump
- Submersible Slurry Pump
- Mud Agitator
- Mud Gun
- Jet Mud Mixer
- Desilter
- Water Tank
- Mud Tank
- Diesel Tank
- Balanced Elliptical Motion Shale Shaker
- Oilfield Drilling Mud Desander
-
Solids Control System
- Mobile Solids Control System
- Arctic Solids Control System
- Solids Control System
-
TBM
- Tunnel Boring Mud System
-
HDD
- HDD Mud Recovery System
-
-
- News
- Services
- Marketing
- About Us
- Contact Us
Home > KOSUN News >
Gazprom subsidiary will invest 516 million rubles to build new natural gas pipeline.
May 24, 2019
According to the news of Neftegaz.RU St. Petersburg on May 7, Gazprom Mezhregiongaz will invest about 516 million rubles to build three natural gas pipelines in Pskov and Arkhangelsk.
Openly bid for the construction of two natural gas pipelines in Pskov and a natural gas pipeline in Arkhangelsk. The initial cost of the project is 5.16 million rubles.
Within one year, the contractor must build a gas pipeline with a total length of 6km for three gas rooms in Nevers, Pskov. Within one year, a 15km natural gas pipeline will be built near the village of Holkovo in Arkhangelsk. Within two years, a natural gas pipeline with a total length of 36km from the natural gas distribution station in Novoskolniki to Nazimovo, Nasva and Pskov will be constructed.

Openly bid for the construction of two natural gas pipelines in Pskov and a natural gas pipeline in Arkhangelsk. The initial cost of the project is 5.16 million rubles.
Within one year, the contractor must build a gas pipeline with a total length of 6km for three gas rooms in Nevers, Pskov. Within one year, a 15km natural gas pipeline will be built near the village of Holkovo in Arkhangelsk. Within two years, a natural gas pipeline with a total length of 36km from the natural gas distribution station in Novoskolniki to Nazimovo, Nasva and Pskov will be constructed.
