KOSUN Drilling Rig Solid Control System Introduction

Apr 25, 2024

In petroleum drilling engineering, the configuration of drilling rig solid control system equipment is typically determined by the drilling depth and the specifications of the drilling rig. Common drilling rig specifications include:

2000-meter drilling (550hp) ZJ20 rig
3000-meter drilling (750hp) ZJ30 rig
4000-meter drilling (1000hp) ZJ40 rig
5000-meter drilling (1500hp) ZJ50 rig
7000-meter drilling (2000hp) ZJ70 rig
9000-meter drilling (3000hp) ZJ90 rig

 
                                                                                          Argentina-ZJ50 Drilling Rig Solid Control System


Correspondingly, there are:
ZJ20 rig solid control system
ZJ30 rig solid control system
ZJ40 rig solid control system
ZJ50 rig solid control system
ZJ70 rig solid control system
ZJ90 rig solid control system

 
Xi’an KOSUN can customize solid control systems for rigs ranging from ZJ20 to ZJ90, which include purification, circulation, preparation, weighting, and storage processes for drilling mud.
 
                                                                                             Russia-ZJ30 Solid Control System


KOSUN’s solid control system mainly consists of: liquid-gas separator, mud shale shaker, vacuum degasser, mud cleaner, drilling fluid centrifuge, mud tank, water tank, oil tank, mud agitator, mixing funnel, supply pump (sand pump), replenishment equipment (pump tank), etc.

 
The configuration of the solid control system piping includes: elevated pipelines (from the wellhead to the mud vibrating screen), tank bottom interconnecting pipelines, mud pump suction pipelines, mixing suction pipelines, mixing discharge pipelines, clean water pipelines, mud gun pipelines, and various other piping configurations.